The main areas of work of the center are:
· conducting surveys of the technical condition and inventory of buildings, structures, and networks using GIS technologies, including for facilities under construction in Ukraine funded by international financial organizations;
· development of project-estimate and design documentation for new construction, reconstruction, and capital repairs of facilities in various sectors, including for facilities under construction in Ukraine funded by international financial organizations, for the city of Rivne and NUWEP;
· author supervision of construction (reconstruction) and repair works, supervision of equipment installation, and commissioning works at facilities being built according to projects NDVBC;
· installation, training, and maintenance of software complexes that are part of the 'START' system;
· implementation of modern computer technologies for automated design and engineering into the practice of real coursework and diploma design and the development of master's theses by students of various specialties;
· conducting thermal imaging surveys, inspecting internal and external engineering systems of buildings, structures, and networks using electronic distance meters, thermal imagers, anemometers, pyrometers, gas analyzers, etc. for energy audits of buildings.
Throughout 2000-2026, the NDVBC NDS has completed various types of work amounting to over 6 million UAH, which, with few exceptions, have been implemented:
· developed and implemented 'Optimization Schemes for Centralized Water Supply and Sewage Systems of Settlements' for 2 cities;
· conducted technical inspections and inventory of more than 20 existing industrial and residential civil construction facilities, the results of which have been implemented in reconstruction projects or used for their commissioning (List attached);
· Project and cost estimate documentation and research has been developed for more than 70 facilities, based on which more than 30 objects of industrial and civil construction, water supply and drainage, heat and gas supply, heating, hot water supply, building ventilation, and engineering melioration have been built and put into operation (List attached);
· Authorial supervision has been conducted for the construction of more than 25 designed objects (List attached);
· Installation, training, and maintenance of the computer programs of the integrated system "PUSK" have been carried out at more than 60 enterprises in Western Ukraine;
· More than 25 reports with expert conclusions and recommendations on various issues and problems of construction and operation of water supply and heat supply systems have been prepared (List attached).
The results of scientific developments are also used in the educational process of the Department of Heat Supply and Alternative Energy:
· in the working project of the solid fuel boiler of the NUVHP dormitory;
· in projects for installing ventilation systems with heat recovery from exhaust air in classroom No. 664 of the Department of Heat Supply and Alternative Energy and the department of processing new and old literature of the scientific library of NUVHP;
· in the pre-project documentation for a heat pump installation using low-potential heat from wastewater and a geothermal field for hot water supply of dormitories No. 7 and No. 8 of NUVHP and the creation of a training-production laboratory in the auxiliary rooms building;
· in the pre-project documentation (preparation of initial data and documentation; express energy audits of buildings on the NUVHP campus; participation in the committees' tender activities) and scientific support (verification of project cost documentation for thermo-modernization of educational buildings No. 2 and 6) for NUVHP's participation in the Ministry of Education's credit project "Higher Education of Ukraine. Energy Efficiency and Sustainable Development";
· in working programs and syllabuses of various disciplines of educational programs in Water Supply, Heat Supply, Energy Efficiency and Project Management;
· when developing methodological guidelines for the following disciplines: "Basics of Project Management" (Water Supply, Heat Supply - NNIAB), "Basics of Systems Analysis" (Water Supply, Heat Supply, Gas Supply - NNIAB, NNIVG), "Mathematical Methods for Solving Engineering Problems" (Water Supply, Heat Supply - FVG) and "Mathematical Modeling" in 2 parts (Water Supply - FVG), "Network Technologies of Projecting", "Economics of Water Supply Systems" for developing economic sections of diploma projects and master's theses (Heat Supply, Energy Efficiency in Project Management - NNIAB), "Refrigeration Units and Heat Pumps" (Heat Supply, Energy Efficiency in Project Management - NNIAB), etc.;
· in practical classes and laboratory work, GIS programs "University" and "Optimum" are used.
More than 60 students from the fields of TGV, EEBiOIS, ViV, MBG, PCB, TE, ABS, etc. (primarily with official employment related to the contractual research themes of the Research and Development Center at NUWGP) were involved in research work, real surveys, and design, along with over 35 instructors, graduate students, and staff from various departments and units of NUWGP (on a part-time basis).
AppendixIt seems there was an error in your input. Could you please provide the content you'd like translated?
Project documentation and pre-project works for the scientific and production business center (SPBC) of NUVHP, completed for water supply and sewerage facilities in populated areas of Ukraine from 1987 to 2026.
|
№ |
Name of the development |
Year |
Implementation stage |
|
|
Please provide the full text or content that you would like translated. stream |
Please provide the complete text you would like translated. Decision |
|||
|
Project and cost documentation and pre-project works |
||||
|
1 |
Working project “Reconstruction of preliminary treatment facilities and sewage treatment plants in Ternopil city.Dairy plant” |
1987 |
1988 |
Completed |
|
2 |
Working Project “Reconstruction of sewage treatment facilities in Ternopil citydairy plant” |
1988 |
1990 |
Completed |
|
3 |
Project "Sewage Treatment Facilities of the Dairy Plant in Dolynska, Kirovohrad Region" |
1990 |
1990 |
Completed |
|
4 |
Working project "Reconstruction of wastewater treatment facilities of the dairy plant in Sambir, Lviv region" |
1994 |
1994 |
Completed |
|
5 |
Working project "Reconstruction of the chlorination station into an electrolysis unit for the production of hypochlorite"Naat the wastewater treatment facilities in Zdolbuniv, Rivne region" |
1994 |
1995 |
Commissioned |
|
6 |
Working project "Reconstruction of the wastewater treatment facilities of the dairy conservatory plant in Balta, Odesa region" and manufacturing non-standardized equipment for them |
1994 |
1996 |
Completed |
|
7 |
Working project and asupervisory oversight"Reconstruction of the air blowing station and aeration system of the wastewater treatment facilities in Hoshcha, Rivne region" |
1994 |
1996 |
Commissioned |
|
8 |
Working project "Wastewater treatment facilities of the meat processing plant in Pidberiztsi, Lviv region" |
1996 |
1997 |
Completed |
|
9 |
Working project "Reconstruction of the sewage treatment facilities in Brusyliv, Zhytomyr region. |
2000 |
2000 |
Completed |
|
10 |
Working project "Reconstruction of the sewage treatment facilities of the Hnidyn Gas Condensate Plant" |
2000 |
2001 |
Commissioned |
|
11 |
Working project "Reconstruction of the sewage treatment facilities of the PS in Avhustivka village" |
2000 |
2001 |
Commissioned |
|
12 |
Working project "Reconstruction of the sewage treatment facilities of the PS in Snihurivka city" |
2000 |
2001 |
Commissioned |
|
13 |
Working project "Reconstruction of the sewage treatment facilities in Dzerzhynsk, Zhytomyr region" |
2001 |
2002 |
Completed |
|
14 |
RworkingIt seems that your message may be incomplete or unclear. Could you please provide the text you would like translated?aboutIt seems there might have been a mistake, as "є" translates to "is" or "exists" in English. If you have specific text you would like translated, please provide it."Sanitary Protection Zones of the Zdolbuniv (Railway) Water Intake" |
2001 |
2002 |
Commissioned |
|
15 |
Working project and author's supervision "Reconstruction of the sewage treatment facilities of the Pavlivsky Brewery" |
2003 |
2004 |
Put into operation |
|
16 |
Working project "External engineering networks for the practice and recreation base of UDWG in the village of Svitiaz, Shatsk district, Volyn region." |
2004 |
2004 |
Put into operation |
|
17 |
Startup and adjustment work at the wastewater treatment facilities of the Pavlivsky Brewery. |
2005 |
2005 |
Commissioned |
|
18 |
Working documentation "Preparation of the site for the development and arrangement of the area for an artificial water body on the territory of the rehabilitation and health complex LLC “TEK “World of Paths” |
2005 |
2005 |
Commissioned |
|
19 |
Author's supervision over the implementation of the working documentation "Preparation of the site for the development and arrangement of the area for an artificial water body on the territory of the rehabilitation and health complex LLC “TEK “World of Paths”" |
2005 |
2005 |
Commissioned |
|
20 |
Working project “Water purification station in the town of Rokyni, Lutsk district – construction” |
2006 |
2006 |
Commissioned |
|
21 |
Passportization of water supply and sewage networks of LVD-5C |
2006 |
2006 |
Commissioned |
|
22 |
Survey and pre-design recommendations for the reconstruction of the water supply system and treatment facilities of residential buildings LVD-5C |
2006 |
2006 |
Completed |
|
23 |
Working project “Reconstruction of the sewage treatment facilities of Katerynivska correctional colony No. 46” |
2006 |
2009 |
Put into operation operation |
|
24 |
Project for the construction organization 'Dismantling of the biofilter building at the sewage treatment facilities of Demydivka town' |
2007 |
2007 |
Implemented |
|
25 |
Working project 'Sewage system, Demydivka town - reconstruction (first stage)' |
2007 |
2011 |
Put into operation |
|
26 |
Author supervision over the construction 'Sewage system, Demydivka town - reconstruction (first stage)' |
2008 |
2011 |
Completed |
|
27 |
Working project 'Construction of the electrolysis station for drinking water disinfection in Sambir' |
2007 |
2007 |
Put into operation |
|
28 |
Calculation of specific fuel and energy resource consumption norms for the water supply and sewage facilities of the Demydiv municipal enterprise |
2007 |
2007 |
Completed |
|
29 |
Survey of the wastewater system of JSC "Tochmash" (Donetsk) and technical-economic justification for its reconstruction |
2007 |
2008 |
Implemented |
|
30 |
Engineering surveys for the working project "Sewer networks and structures of the private enterprise "Swine Complex "Zorya" |
2007 |
2007 |
Implemented |
|
31 |
Calculation of specific consumption norms for fuel and energy resources of water supply and sewage facilities of the Ostrog communal enterprise "Vodokanal" |
2007 |
2007 |
Completed |
|
32 |
Working project "External site sewer networks of the "Yuventa" factory in Slavuta, Khmelnytsky region" |
2007 |
2007 |
Commissioned |
|
33 |
Working project "Preliminary wastewater treatment facilities of the dry egg powder production workshop" |
2007 |
2008 |
Commissioned |
|
34 |
Technical and economic justification for the reconstruction and intensification of the operation of the wastewater treatment plant in Kuznetsovsk |
2008 |
2008 |
Completed |
|
35 |
Working project "Water purification station in the village of Bryshche, |
2008 |
2008 |
Commissioned |
|
36 |
Working project “Construction of a drainage system from residential areas suffering from flooding in the city of Sarny” |
2008 |
2009 |
Commissioned |
|
37 |
Author's supervision for the object "Sewerage system, town of Demidivka reconstruction (1st phase)" |
2008 |
2011 |
Commissioned |
|
38 |
Author's supervision and commissioning works at the preliminary wastewater treatment facilities of the dry egg powder production workshop |
2008 |
2008 |
Commissioned |
|
39 |
Pre-project and project works for the object "Facilities for the treatment of household wastewater of output 2 of JSC "Rokytne Glass Plant" |
2008 |
2008 |
Commissioned |
|
40 |
Working project "Improvement of the water treatment process at the enterprise "Kozlivskyi Distillery" |
2008 |
2008 |
Put into operation |
|
41 |
Changes to the design and estimate documentation "Reconstruction of the wastewater treatment facilities of the Katerinivska correctional colony No. 46" |
2008 |
2009 |
Put into operation |
|
42 |
Working project "Sanitary protection zones for water intake wells of the separate unit 'Rivne Water Supply Distance' of the Lviv Railway" |
2009 |
2010 |
Put into operation |
|
43 |
Working project "Reconstruction of the sewage pumping station and replacement of the sewage pressure pipeline in the village of Shchastlyve, Boryspil district, Kyiv region" |
2010 |
2012 |
Completed |
|
44 |
Sanitary protection zone projects for water intakes at the stations Obary (village of Horodok, Rivne district, Rivne region), Klevany (village of Klevany, Rivne district, Rivne region), Dubrovytsia (city of Dubrovytsia, Dubrovytsia district, Rivne region), Manevychi (town of Manevychi, Manevychi district, Volyn region), Zviniache (Horokhiv district, Volyn region), Nesvich-Volynskyi (village of Charukiv, Lutsk district, Volyn region) |
2011 |
2012 |
Put into operation |
|
45 |
Working project "Reconstruction of the treatment facilities in the city of Baranivka, Zhytomyr region" |
2012 |
2012 |
Put into operation |
|
46 |
Working project "Restoration of sewage treatment facilities on Myru Street" m. Starokostiantyniv |
2012 |
2012 |
Commissioned |
|
47 |
Optimization scheme for the centralized water supply system of the city of Volochysk, Khmelnytskyi region |
2012 |
2012 |
Completed |
|
48 |
Optimization scheme for the centralized wastewater treatment system of the city of Volochysk, Khmelnytskyi region |
2012 |
2012 |
Completed |
|
49 |
Working project "Construction of a new artesian well at the 'Central' water intake" |
2012 |
2012 |
Completed |
|
50 |
Adjustment of the working project and author's supervision "Reconstruction of the wastewater treatment facilities of the town of Letichiv, Khmelnytskyi region" |
2012 |
2014 |
Implemented |
|
51 |
Working project "Construction of a summer cottage residential building for the Educational and Scientific Institute of Continuing Education of NUVHP for internships and recreation in the Grabivets tract of the Demidiv district of Rivne region, including a water well" |
2013 |
2013 |
Commissioned |
|
52 |
Working project "Construction of an administrative and household building of the Technical College of NUVHP in the Grabivets tract of the Demidiv district of Rivne region, including wastewater treatment facilities" |
2013 |
2013 |
Completed |
|
53 |
Conducting a comparative analysis of the formulas for calculating the fee for the discharge of excessively contaminated wastewater into the sewer systems of the city of Lviv and other settlements in Ukraine |
2013 |
2013 |
Completed |
|
54 |
Expert opinion on the level of emergency situation that arose as a result of a technological accident at the sewer collector on I. Franka, Myru, and Varchuka streets in the city of Starokostiantyniv, Khmelnytskyi region. |
2013 |
2013 |
Completed |
|
55 |
Working project "Construction of a water supply system for the military department of NUVHP" |
2013 |
2013 |
Completed |
|
56 |
Research for judicial complex expertise in case No. 918/1153/14 of the Rivne Appellate Economic Court" |
2015 |
2015 |
Completed |
|
57 |
Inspection and recommendations for improving the thermal moisture regime of the filter building at the "Novy Dvir" pumping station in Rivne |
2015 |
2015 |
Completed |
|
58 |
Correction of project and estimate documentation "Reconstruction of wastewater treatment facilities in the town of Letichiv, Khmelnytskyi region" |
2016 |
2017 |
Implemented |
|
59 |
Technical inspection, evaluation of technical condition, and certification of structures and equipment of the biological wastewater treatment station located at: Mariupol, Pokrovskoye village, Kuznetsova St., 46 |
2017 |
2018 |
Implemented |
|
60 |
Analysis of domestic regulatory framework and global experience on issues of calculating the amount of thermal energy consumed for heating common areas, thermal energy and developing proposals for changes to the "Methodology for calculating the amount of heat consumed for heating common areas in apartment buildings" |
2017 |
2018 |
The methodology has been adopted at the Ministry of Regional Development Board as a subordinate legal act of the Law of Ukraine "On commercial accounting of thermal energy and water supply" |
|
61 |
Working project "Construction of a stormwater drainage collector with a length of 925 m from Danchenko St. to May 1 St. in the city of Chernomorsk, Odesa region" |
2017 |
2018 |
Completed |
|
62 |
Working project "Construction of a stormwater drainage collector 125 m long from 5-Liniya Street to the existing network in Chornomorsk, Odesa region." |
2017 |
2018 |
Completed |
|
63 |
Working project "Construction of wastewater treatment facilities in Chornomorsk, Odesa region." |
2017 |
2019 |
Completed |
|
64 |
Author's supervision "Construction of a stormwater drainage collector 125 m long from 5-Liniya Street to the existing network in Chornomorsk, Odesa region." |
2018 |
2018 |
Commissioned |
|
65 |
Measurements and inspection of the technical condition of the existing structures and networks of KNS 53/418, v/m No. 53, city. Yavoriv |
2018 |
2018 |
Completed |
|
66 |
Measurements and inspection of the technical condition of the existing structures and networks of KNS 53/429, v/m No. 53, city. Yavoriv |
2018 |
2018 |
Completed |
|
67 |
Author's supervision "Construction of a stormwater drainage collector 925 m long from Danchenka St. to May 1st St. in Chornomorsk, Odesa region." |
2019 |
2020 |
Under construction (2 sections completed) |
|
68 |
Survey and assessment of the technical condition of sewage treatment facilities in Popasna, Luhansk region. |
2019 |
2019 |
Completed |
|
69 |
Survey and assessment of the technical condition of pressure sewage collectors of SE "MTP "Yuzhny" |
2019 |
2019 |
Completed |
|
70 |
Recommendations for the disposal of wastewater treatment products at the sewage treatment facilities of ROVKP VKG "Rivneobvodokanal" in the town of Kvasyliv |
2020 |
2020 |
Implemented ROVKP VKG "Rivneobvodokanal" in an international grant forProgram "Interreg NEXT Poland – Ukraine 2021–2027" |
|
71 |
Technical survey of buildings and structures for Stages 2 and 3 of the project "Consulting services for the Municipal Climate Protection Program II (support activity for the project "Municipal Water Management Project in Chernivtsi, stages 2 and 3")" |
2021 |
2022 |
Implemented |
|
72 |
Additional technical inspections of networks and structures for Stages 2 and 3 of the project 'Consulting Services for the Municipal Climate Protection Program II (support measure for the project 'Municipal Water Management Project in Chernivtsi, Stages 2 and 3')' |
2023 |
2024 |
Implemented |
|
73 |
Services for a comprehensive assessment of the condition of the wastewater treatment facilities of KP 'Chernivtsivodokanal' in the village of 'Mahala' of the Chernivtsi district and determining their overload due to the inflow of industrial wastewater with pollutant concentrations exceeding the permissible limits for acceptance into the sewer network of Chernivtsi |
2026 |
2026 |
In progress (Completed Stage No. 1) |
|
|
|
|
|
|
Appendix B
Project and cost documentation and pre-project works carried out for the facilities of NUWGP from 2000 to 2026
|
№ |
Development Title |
Year |
Implementation Stage |
|
|
Start |
Completion |
|||
|
Project and cost documentation and pre-project works |
||||
|
1 |
Working aboutIt seems you've entered a single character. Could you please provide the text you'd like me to translate?ICT and Construction"Repair of the heating unit of educational building No. 6"RDTUwith the replacement of the existing heat meter with the SVTU-10 heat and water meter. |
2000 |
2001 |
Put into operation |
|
2 |
Working project andauthor supervision overconstructionIt seems like your message got cut off. Please provide the text you'd like me to translate.It seems that the text is incomplete. Please provide the full text you'd like translated.It seems like your message may be incomplete. Could you please provide the content you'd like to have translated?"Regulation of Dormitory No. 8 of RDTU in the Residential Building" |
2001 |
2006 |
Put into operation the 1st stage |
|
3 |
Working project and construction"Reconstruction of the heating system of the educational building of the Kostopil Building College of the RDUT” |
2004 |
2004 |
Put into operation |
|
4 |
Working project "External engineering networks for the practice and recreation base of UDUVGP in the village of Svitiaz, Shatsk District, Volyn Region" |
2004 |
2004 |
Put into operation |
|
5 |
Working projectand construction"Automated accounting and heat energy regulation node for the 1st stage of the reconstruction of dormitory No. 8 of NUWGP at 8 Student Street, Rivne" |
2006 |
2006 |
Put into operation |
|
6 |
Working project and construction "Reconstruction of the heating system of the gym of the Technical College of NUWGP in Rivne" |
2007 |
2007 |
Put into operation |
|
7 |
Working project "Reconstruction of the internal water supply and sewage system of the recreation base 'Vodnik' in the village of Zaliznyy Port" |
2007 |
2007 |
Commissioned |
|
8 |
Working project "Reconstruction of the premises of the technical college NUVHP at 24 Serpnya St. in Rivne to a restroom" |
2008 |
2008 |
Commissioned |
|
9 |
Working project "Engineering networks and landscaping for single-family residential buildings in the territory of NUVHP, plot No. 1 (1st stage)" |
2009 |
2009 |
Completed |
|
10 |
Working project "Conducting repair and restoration works on the ceiling of the elevator machine room R-298 in dormitory No. 7 of NUVHP" |
2011 |
2011 |
Commissioned |
|
11 |
Working projectand construction"Capital repair of educational building No. 4 of NUVHP (installation of window blocks) in Rivne at V. Chornovola St., 41" |
2011 |
2011 |
Commissioned |
|
12 |
Working project and construction "Reconstruction of the dining room No. 1 of NUVHP for the arrangement of classrooms of the Department of Architectural Projecting, Designing, and Graphics" |
2011 |
2016 |
A cafeteria with 48 seats put into operation |
|
13 |
Working project and construction "Capital repair of educational building No. 7 of NUWGP in Rivne, Myrjuschenka St., 53a" |
2012 |
2012 |
Put into operation |
|
14 |
Working project "Capital repair of educational lecture hall No. 278" (heating, ventilation, and electrical lighting) |
2012 |
2012 |
Put into operation |
|
15 |
Working project "Reconstruction of the boiler house of the student campus of NUWGP in Rivne, V. Chornovola St., 49v (first and second phases – architectural and construction part)" |
2012 |
2014 |
Put into operation |
|
16 |
Norm control and verification of design documentation(working project) andtechnical supervision of construction.„Installation of automated accounting and regulation units for thermal energy in educational buildings and dormitories of the student campus of NUWGP" (15 units) |
2012 |
2013 |
Put into operation |
|
17 |
Working projectand author's supervision for 'Construction of the water supply system of NUWGP'" |
2012 |
2013 |
Commissioned |
|
18 |
Working project 'Reconstruction of the sewage pumping station of the practice and recreation base "Vodnik" in the village of Zalizny Port, Kherson region.' |
2013 |
2013 |
Completed |
|
19 |
Working project and construction 'Reconstruction of the roof of educational building No. 7 of NUWGP in Rivne at Myriushchenka Street, 53' (phases 1-3) |
2013 |
2016 |
Commissioned |
|
20 |
Working project 'Construction of a summer residential house for the Educational and Scientific Institute of Postgraduate Education of NUWGP for internships and recreation in the Grabivets area of the Demydiv district, Rivne region, including a water well.' |
2013 |
2013 |
Commissioned |
|
21 |
Working project 'Construction of an administrative and household building for the Technical College of NUWGP in the Grabivets area of the Demydiv district, Rivne region, including wastewater treatment facilities.' |
2013 |
2013 |
Completed |
|
22 |
Working project 'Reconstruction of the sewage pumping station of the practice and recreation base "Vodnik" in the village of Zalizny Port, Kherson region.' |
2013 |
2013 |
Completed |
|
23 |
Working project 'Construction of the water supply system for the military department training ground of NUWGP.' |
2013 |
2013 |
Completed |
|
24 |
Working project 'Major renovation of the buffet in educational building No. 1 of NUWGP for 36 seating places.' |
2013 |
2013 |
Commissioned |
|
25 |
Working project and construction of “Vinstallation of a decentralized supply and exhaust ventilation system with heat recovery of exhaust air in aud. 229library of NUWGP” |
2016
|
2016 |
Commissioned |
|
26 |
Demonstration project “Finland Ukraine Trust Fund: Energy Efficiency, Renewable Energy and Alternative Types of Energy” “Reconstruction of the hot water supply system of two dormitories using geothermal heat pumps” |
2018 |
2022 |
Commissioned |
|
27 |
Pre-project calculations, inspections and express energy audit of 8 educational buildings of the NUWGP student campus, preparation of output data for full energy audits, working project for the credit project of the Ministry of Education “Higher Education of Ukraine. Energy efficiency and sustainable development” |
2018 |
2021 |
Implemented in the development of energy audits and working projects (WP) |
|
28 |
Scientific support for the conducted energy audits and project-estimate documentation (working projects for thermal modernization of 2 educational buildings of the NUWGP student campus) under the credit project of the Ministry of Education “Higher Education of Ukraine. Energy efficiency and sustainable development” |
2022 |
2025 |
Implemented in the adjustment of the thermal modernization RP |
|
29 |
Working project and author's supervision for the construction of 'Capital repair of the heat network section from the boiler house at 49v Chornovola Street to TK-31 near dormitory No. 4 of NUWGP at 60 Karnaukhov Street in Rivne' |
2022 |
2022 |
Commissioned |
|
|
|
|
|
|
Appendix B
Project-estimate documentation and pre-project works of the NDBVC, performed for the facilities in Rivne in 1999-2026
|
№ |
Development name |
Year |
Implementation stage |
|
|
Start |
Completion |
|||
|
Project-estimate documentation and pre-project works |
||||
|
1 |
Passportization of wastewater treatment facilities in Rivne
|
2003 |
2004 |
Implemented during the development of the RP reconstruction of the wastewater treatment plant |
|
2 |
Working project "Complex of trade pavilions with a café and summer terrace in Rivne on Kyiv Street (near the bus station)" |
2004 |
2005 |
Put into operation |
|
3 |
Working project “Measures to eliminate flooding of the territory around residential building No. 23 on Vidinska Street in Rivne” |
2004 |
2005 |
Put into operation |
|
4 |
Survey, assessment of the technical condition, and passportization of buildings and structures of DP "Rivnenaftoprodukt" of JSC "Concern Halnaftogaz" |
2006 |
2006 |
Completed |
|
5 |
Working project "Design works for the construction of a sewage collector in the Basove Kuta area" |
2007 |
2007 |
Put into operation |
|
6 |
Working project "Reconstruction of the swimming pool premises of School No. 26 in Rivne"
|
2008 |
2008 |
Put into operation |
|
7 |
Working project "Reconstruction and expansion of the African lion enclosure in the Rivne zoological park of national significance, including design works" |
2014 |
2015 |
Put into operation |
|
8 |
Survey and recommendations for improving the thermal and humidity regime of the filtration building of the pumping station 'Novy Dvir' in Rivne |
2015 |
2015 |
Completed |
|
9 |
Adjustment of the working project 'Reconstruction and expansion of the lion enclosure in the Rivne Zoo of national significance, including design works' |
2016 |
2016 |
Commissioned |
|
10 |
Adjustment of the budget documentation for the working project"Major repairs of hydraulic structures of the T.G. Shevchenko park" |
2015 |
2015 |
Completed |
|
11 |
Recommendations for the disposal of sewage treatment products at the sewage treatment facilities of ROVKP VKG 'Rivneoblvodokanal' in the urban-type settlement of Kvasyliv |
2020 |
2020 |
ROVKP VKG 'Rivneoblvodokanal' has been introduced in the international grant forProgram 'Interreg NEXT Poland – Ukraine 2021–2027' |
|
12 |
Grant project 'Creation of a conceptNetZerofor the city of Rivne' (Program 'HORIZON"). Section on heat and gas supply. |
2024 |
2025 |
Completed |